DatasheetQ Logo
Electronic component search and free download site. Transistors,MosFET ,Diode,Integrated circuits

NCP3012 Просмотр технического описания (PDF) - ON Semiconductor

Номер в каталоге
Компоненты Описание
производитель
NCP3012
ON-Semiconductor
ON Semiconductor ON-Semiconductor
NCP3012 Datasheet PDF : 26 Pages
First Prev 11 12 13 14 15 16 17 18 19 20 Next Last
NCP3012
Startup and Shutdown
Once enable is asserted the device begins its startup
process. Closedloop softstart begins after a 400 ms delay
wherein the boost capacitor is charged, and the current limit
threshold is set. During the 400 ms delay the OTA output is
set to just below the valley voltage of the internal ramp. This
is done to reduce delays and to ensure a consistent pre
softstart condition. The device increases the internal
reference from 0 V to 0.8 V in 32 discrete steps while
maintaining closed loop regulation at each step. Some
overshoot may be evident at the start of each step depending
on the voltage loop phase margin and bandwidth. See
Figure 19. The total softstart time is 14 ms.
The softstop process begins once the EN pin voltage
goes below the input low threshold. Softstop decreases the
internal reference from 0.8 V 0 V in 32 steps as with
SoftStart. SoftStop finishes with one “last” high side gate
pulse at half the period of the prior pulse. This helps ensure
positive inductor current following turn off at light loads,
which prevents negative output voltage.
Enable low during SoftStart will result in SoftStop
down counting from that step. Likewise, Enable high during
SoftStop will result in SoftStart up counting from that
step.
0.8 V Output Voltage
25 mV Steps
32 Voltage Steps
Internal Reference Voltage
Internal Ramp
OTA Output
0 .7V
0V
Figure 19. SoftStart Details
http://onsemi.com
11

Share Link: 

datasheetq.com  [ Privacy Policy ]Request Datasheet ] [ Contact Us ]